1. Home
  2. Resources
  3. How we work
COOPERATION / CooperationWorkflow

From drawing to shipment,every step has a deliverable

For engineers and buyers connecting on die cutting / slitting / laminating for the first time: material plan, tolerances, lead time, and price sit in one reply; first article is approved before production—so there's no "done but we don't know if it's right." Lead times are typical estimates; rush can compress some steps—first-article approval cannot be skipped.

Starting point Drawing / Sample Review reply 1–2 days Sample approval 3–5 days Typical lead time 3–7 days
00 / Up front

Who it's for, and how it relates to capabilities

This page is "how we collaborate"; the capabilities page is "what we can do." Use both: review the six processes and material matrix first, then send drawings for a quote in the order below.

Who it's for

Engineers · buyers · project contacts

Anyone who needs inputs, reply content, and first-article confirmation clear in one pass. No CAD—only a sample—still works end to end; for assembled parts, attach conditions and mounting location when you can.

And capabilities

Six processes, one workshop

Slitting, die cutting, laminating, adhesive backing, blanking, and taping run in-house—no shuttling drawings among a materials vendor, a converter, and a packer. Contours, kiss-cuts, die rolls, etc. live on each process subpage; which materials run on which process → Process & materials。

Principle

Confirm first, then scale

Review puts plan, tolerance feasibility, lead time, and price together; sampling confirms size, edge, and (when applicable) peel before production. Consignment converting and full supply both work; consignment material must suit the target process first.

02 / STEPS IN DETAIL

Each step: inputs · deliverables · watch-outs

How fine we can go is set after reviewing the drawing, material behavior, and volume; uncertain structures get sampled first. No invented tolerance figures below.

01
INPUT

Drawing / Sample

~1 day

Make "what you need" clear. Fuller files mean faster review; no drawing doesn't block the flow.

You provide

  • CAD (DXF / DWG / PDF), sketch photos, or physical samples
  • Intended use and substrate (what it bonds to, where it mounts)
  • Rough volume and desired lead time (estimates OK)
  • Assembled parts: mounting location, conditions, whether compression matters

We deliver

  • Receipt confirmation and interpretable size / edge information
  • No drawing: re-measure from sample, or a path to tool from the sample
  • Question list needed for review (missing items asked once, together)

Common blockers

  • Outline only—no assembly or conditions → easy to copy the outline alone
  • Photos without scale / thickness → need a sample or added dimensions
  • Multi-material stacks without layer order → laminating and kiss-cut hard to set
02
QUOTE

Review & quote

1–2 days

One reply with plan and price—fewer back-and-forth questions. Consignment converting and full supply both work.

You provide

  • Drawing / sample from the prior step, plus any extras
  • Whether you supply material (consignment grade, roll width, lot)
  • Target tolerance or an accept-as-sample approach

We deliver

  • Recommended material and process combination
  • Whether target tolerances are feasible (a review conclusion—not a vague promise)
  • Expected volume, lead time, and price
  • If consignment material isn't a fit (debris, delamination, etc.), we flag it early

Common blockers

  • Comparing unit price only, ignoring die / die-roll thresholds → rotary volume bar is usually higher than flatbed
  • Low volume but insisting on an engraved roll → we'll suggest flatbed or slitting
  • Material and process mismatch → see process & materials matrix
03
PROTOTYPE

Sample approval

3–5 days

First article locks "what production will follow." Sampling from one piece; confirm before volume to avoid batch rework.

You provide

  • Confirmation or change points on the quote plan
  • First-article check points (size, edge, kiss-cut depth, peel feel, etc.)
  • Substrates or assemblies to compare against (if any)

We deliver

  • First article (or small pilot)
  • Size / edge confirmation; peel-related confirmation when applicable
  • Production process and pack intent (can be set with the approval)

Common blockers

  • Skip first article and go straight to volume → edge or kiss-cut misses put the whole lot at risk
  • Verbal "close enough" with no retain sample → later disputes lack a baseline
  • Rush that compresses review but still changes structure → lead time and tooling need replan
04
PRODUCTION

Production

By volume

Run to the approved sample and process. In-process sampling with retain samples; inspection can be 100% or AQL by agreement (aligned with the overview).

You provide

  • Confirmed order quantity and lead-time window
  • Pack / label / lot requirements (flag changes early)
  • Consignment lots (if consignment converting)

We deliver

  • Finished parts to the approved process
  • In-process sampling and retain samples
  • Stop-and-talk if production drifts from first article (no verbal drawing swaps in place of the approved part)

Common blockers

  • Mid-production drawing changes → re-review / re-sample; lead time reassessed
  • Large consignment lot-to-lot variation → edge or scrap path may shift; tell us early
  • Quantity add-on without confirming same die and same material → verify the first-article baseline still applies
05
SHIP

Pack & ship

1–2 days

Pack form follows your line: reels, carrier tape, stacking, etc. Shipments include inspection records; orientation-sensitive forms like carrier tape should trial the first reel on-machine.

You provide

  • Receiving and line pack requirements (roll OD, core, carrier orientation, etc.)
  • Label fields and documents that ship with the goods
  • Shipping & emergency contacts

We deliver

  • Finished goods packed as agreed
  • Inspection records
  • Logistics handoff details

Common blockers

  • Wrong carrier orientation → whole-lot line risk; always trial the first reel on-machine
  • Last-minute pack-spec changes → allow time to re-pack
  • Saying "regular courier" but needing crush/dust protection → state the grade clearly
03 / FAQ

What people usually ask before converting

Aligned with the capabilities overview FAQ—handy to check on this page.

No drawing—only a sample. Can you still do it?

Yes. We can re-measure size and edge section, or tool from the sample directly. If the sample is an assembled part, share mounting location and conditions so we don't copy the outline and miss compression.

How is MOQ set?

Sampling from one piece; production MOQ depends on material and process—slitting by roll, die cutting by lot. Rotary needs an engraved roll, so the volume bar is higher than flatbed; if volume is low we'll suggest flatbed or slitting instead.

Typical lead time?

Usually 3–7 days, including tooling and first-article approval. Rush can compress some steps—first-article approval cannot be skipped.

Can you convert only, with our material?

Yes. Consignment converting and full supply both work. For consignment we confirm the material suits the target process first—some shed debris or delaminate in die cutting, and we'll flag that early.

Send a drawing,
see what we can do first.

Drawing + volume + lead time—we'll reply with a material plan, tolerances, and price. No drawing? Ship a sample or describe the conditions.

→ Inquire now